1/21/2024 0 Comments Interstate 65 traffic conditionsJensen said at this time it is too early to estimate how long the entire project will take, or how much it will cost. "We are trying to make it better and safer for everyone." "There are going to be some headaches throughout this project, so please be patient," said Jensen. The construction will take at least 3 years to complete. TDOT said it has been funded, and officials hope to reward the contract in August. The next phase to be completed will be from SR 25 in Cross Plains to SR 109 in Portland. from SR 109 to Kentucky State Line - completed.from near SR 25 (Main Street) to near SR 109.from SR 257 (Bethel Road) to SR 25 (Main Street).from near SR 41 (US 31W) to near SR 257 (Bethel Road).from Rivergate Parkway to near SR 41 (US 31W). ![]() TDOT said due to the length of the corridor, improvements have been separated into smaller sections or phases: An auxiliary lane will also be added in each direction between the interchanges of Rivergate Parkway (Exit 96) and SR 174 (Long Hollow Pike, Exit 97) to accommodate traffic exiting and entering the roadway.Two northbound truck climbing lanes will be constructed – one between mile markers 99 and 100 and another between mile markers 102 and 104.I-65, north of Nashville, will be widened from four to six lanes with three 12-foot travel lanes in each direction, 12-foot paved outside shoulders, 12-foot paved inside shoulders, with approximately 300 feet of right-of-way and a concrete median barrier wall where required.TDOT provided the following outline of the project: "This has been in the works for a long time, and we know it’s a critical path that needs to be addressed." "We know it’s a vital corridor, not only for Tennessee, but for surrounding states," said Heather Jensen, Community Relations Officer for TDOT. TDOT officials said the project will "address congestion, improve safety, and traffic operations, and accommodate current and future traffic demands.” (WTVF) - The Tennessee Department of Transportation has announced plans to widen Interstate 65 through Davidson, Robertson, and Sumner Counties.Īpproximately 25.8 miles will be widened from Nashville to the Kentucky state line.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |